SEW24

Operations & maintenance

Annual and semi-annual inspections, maintenance and diagnostics. The scope takes account of manufacturer documentation, turbine age and service history.

A technician reviews a checklist on a tablet next to the gearbox in a turbine nacelle.

Inspections and diagnostics

Scheduled maintenance
Checks on bolted connections, control system tests, electrical measurements and replacement of filters and consumables.
Inspection planning
We consider the turbine type and age, previous faults, grid characteristics and any upgrades already made.
Additional checks
Inspection findings can lead to further checks, such as gearbox borescopy, vibration measurements or thermal imaging.
A technician checks a gearbox inside a wind turbine nacelle.
Illustrative image

Inspection plan

The scope is based on the turbine model, fault history and manufacturer documentation.

Technical details

Inspection plan

The scope is based on turbine model and year, fault history, grid characteristics and previous upgrades.

Annual and semi-annual inspections

Scheduled tasks follow the manufacturer’s instructions and the agreed scope.

  • control systems tests
  • electrical measurements of components
  • laboratory tests of oils and greases
  • checking bolt connections
  • topping up lubricants level
  • replacing filters and consumables
  • inspections of electrical, hydraulic and mechanical components
  • measurements of replaceable elements (brushes, brakes)
  • dirt removal
Additional diagnostics

Additional checks are defined by component condition and findings from the inspection.

  • gearbox borescopic tests
  • laser alignment
  • vibration tests
  • thermovision tests
  • rotor blade inspections

Enquiry information

  • Turbine manufacturer, model, year and wind farm location.
  • Last service date and details of previous faults or upgrades.
  • Preferred dates and the scope of the inspection, if already known.